Tower Bridge When Was It Built

Tower Bridge When Was It Builtにまつわる最新トピックを詳しく紐解きます。

Why did it take eight whole years? Well, London in the 1880s had a problem: the East End was getting swamped with traffic, but the Thames was still a busy highway for ships. You couldn’t just slap up a normal bridge—it would block the boats. So the city held a design competition in 1876 (fancy, right?), but nobody liked any of the entries. Classic bureaucracy.

Finally, a guy named Horace Jones—the city architect—partnered with engineer John Wolfe Barry (yeah, that Barry family of architects) to dream up a bridge that could lift. The result? A combined suspension and bascule bridge—those two giant leaves that go up like a drawbridge. Construction started in 1886, and they had to dig 70-foot-deep pits for the piers into the riverbed. Imagine doing that without modern machines—just men, scoops, and a lot of swearing.

The Sticky Part: Money and Men

Building a monster bridge in Victorian London was pricey. The total cost shot up to about £1.2 million—that’s like hundreds of millions today. And get this: over 400 workers sweated away on the site, with 10 men tragically losing their lives during construction. They didn’t get sick days or a safety harness—just a pat on the back and a pint of ale, probably.

Meanwhile, the public hated the design at first. Critics called it “pretentious” and “a circus act”—can you believe it? They thought the neo-Gothic stone cladding on the steel skeleton was cheesy. Irony: now tourists queue for hours to take selfies with that same “cheesy” facade. Londoners, you never learn.

Stunning vintage photos show Tower Bridge through the decades, from itsStunning vintage photos show Tower Bridge through the decades, from its

佐藤 大輔

佐藤 大輔

シニアコンテンツプロデューサー

最新のテクノロジーと生活デザインの融合をテーマに、国内外の最新トピックを発信しています。

Share this article
Twitter Facebook Pinterest